Author |
Title |
Date
|
ASCE |
Monitoring Dam Performance: Instrumentation and Measurements |
2018
|
FEMA |
Federal Guidelines for Dam Safety (FEMA P-93) |
2023
|
FEMA |
Model State Dam Safety Program (FEMA P-316) |
2022
|
FEMA |
Dam Safety Warning Signs Best Practices (FEMA P-2188) |
2021
|
FEMA |
Emergency Operations Planning: Dam Incident Planning Guide (FEMA P-508) |
2019
|
FEMA |
Pocket Safety Guide for Dams and Impoundments (FEMA P-911) |
2016
|
FEMA |
Evaluation and Monitoring of Seepage and Internal Erosion (FEMA P-1032) |
2015
|
FEMA |
Federal Guidelines for Dam Safety Risk Management (FEMA P-1025) |
2015
|
FEMA |
Technical Manual: Overtopping Protection for Dams (FEMA P-1015) |
2014
|
FEMA |
Emergency Action Planning for Dams (FEMA P-64) |
2013
|
FEMA |
Federal Guidelines for Inundation Mapping of Flood Risks Associated with Dam Incidents and Failures (FEMA P-946) |
2013
|
FEMA |
Selecting and Accommodating Inflow Design Floods for Dams (FEMA P-94) |
2013
|
FEMA |
Filters for Embankment Dams |
2011
|
FEMA |
Technical Manual: Outlet Works Energy Dissipators (FEMA P-679) |
2010
|
FEMA |
Geotextiles in Embankment Dams (FEMA P-730) |
2008
|
FEMA |
Emergency Action Planning for State Regulated High-Hazard Potential Dams (FEMA P-608) |
2007
|
FEMA |
Technical Manual: Plastic Pipe Used in Embankment Dams (FEMA P-675) |
2007
|
FEMA |
Federal Guidelines for Dam Safety: Earthquake Analyses and Design of Dams (FEMA P-65) |
2005
|
FEMA |
Technical Manual: Conduits through Embankment Dams (FEMA P-484) |
2005
|
FEMA |
Technical Manual for Dam Owners: Impacts of Animals on Earthen Dams (FEMA P-473) |
2005
|
FEMA |
Technical Manual for Dam Owners: Impacts of Plants on Earthen Dams (FEMA P-534) |
2005
|
FEMA |
Federal Guidelines for Dam Safety: Hazard Potential Classification System for Dams (FEMA P-333) |
2004
|
FEMA |
Federal Guidelines for Dam Safety: Glossary of Terms (FEMA P-148) |
2004
|
FERC |
Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 15- Supporting Technical Information Document |
2021
|
FERC |
Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 11- Arch Dams |
2018
|
FERC |
Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 12- Water Conveyance |
2018
|
FERC |
Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 13- Evaluation of Earthquake Ground Motions |
2018
|
FERC |
Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 14- Dam Safety Performance Monitoring Program |
2017
|
FERC |
Risk-Informed Decision Making (RIDM) Interim Policy Guidance |
2016
|
FERC |
Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 3- Gravity Dams |
2016
|
FERC |
Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 1- General Requirements |
2015
|
FERC |
Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 2- Selecting and Accommodating Inflow Design Floods for Dams |
2015
|
FERC |
Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 6- Emergency Action Plans |
2015
|
FERC |
Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 9- Instrumentation and Monitoring |
2015
|
FERC |
Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 4- Embankment Dams |
2004
|
FERC |
Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 8- Determination of the Probable Maximum Flood |
2001
|
FERC |
Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 10- Other Dams |
1997
|
FERC |
Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 7- Construction Quality Control Inspection Program |
1993
|
FERC |
Guidelines for Public Safety at Hydropower Projects |
1992
|
FERC |
Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 5- Geotechnical Investigations and Studies |
1991
|
ICMM |
Tailings Management: Good Practice Guide |
2021
|
ICMM |
Global Industry Standard on Tailings Management |
2020
|
NRCS |
National Engineering Handbook: Chapter 5 - Streamflow Data |
2020
|
NRCS |
National Engineering Handbook: Chapter 4 - Storm Rainfall Depth and Distribution |
2019
|
NRCS |
National Engineering Handbook: Chapter 21 - Design Hydrographs |
2019
|
NRCS |
Technical Release 210-60: Earth Dams and Reservoirs |
2019
|
NRCS |
National Engineering Handbook: Chapter 26 - Gradation Design of Sand and Gravel Filters |
2017
|
NRCS |
National Engineering Handbook: Chapter 6 - Stream Reaches and Hydrologic Units |
2015
|
NRCS |
National Engineering Handbook: Chapter 50 - Earth Spillway Design |
2014
|
NRCS |
National Engineering Handbook: Chapter 51 - Earth Spillway Erosion Model |
2014
|
NRCS |
National Engineering Handbook: Chapter 17 - Flood Routing |
2014
|
NRCS |
National Engineering Handbook: Chapter 2 - Engineering Geologic Investigations |
2012
|
NRCS |
National Engineering Handbook: Chapter 3 - Engineering Classification of Earth Materials |
2012
|
NRCS |
National Engineering Handbook: Chapter 4 - Engineering Classification of Rock Materials |
2012
|
NRCS |
National Engineering Handbook: Chapter 5 - Engineering Geology Logging, Sampling, and Testing |
2012
|
NRCS |
National Engineering Handbook: Chapter 14 - Stage Discharge Relations |
2012
|
NRCS |
National Engineering Handbook: Chapter 30 - Groundwater Hydrology and Geology |
2010
|
NRCS |
National Engineering Handbook: Chapter 15 - Time of Concentration |
2010
|
NRCS |
National Engineering Handbook: Chapter 7 - Hydrologic Soil Groups |
2009
|
NRCS |
National Engineering Handbook: Chapter 45 - Filter Diaphragms |
2007
|
NRCS |
National Engineering Handbook: Chapter 16 - Hydrographs |
2007
|
NRCS |
National Engineering Handbook: Chapter 9 - Hydrologic Soil-Cover Complexes |
2004
|
NRCS |
National Engineering Handbook: Chapter 10 - Estimation of Direct Runoff from Storm Rainfall |
2004
|
NRCS |
National Engineering Handbook: Chapter 11 - Snowmelt |
2004
|
NRCS |
National Engineering Handbook: Chapter 1 - Introduction |
1997
|
NRCS |
Technical Release 210-39: Hydraulics of Broad-Crested Spillways |
1968
|
UN |
Safety Guidelines and Good Practices for Tailings Management Facilities (ECE 1326665) |
2014
|
USACE |
Instrumentation of Embankment Dams and Levees (EM 1110-2-1908) |
2020
|
USACE |
Best Practices in Dam and Levee Safety Risk Analysis |
2019
|
USACE |
Construction Project Geotechnical and Materials Completion Report for Major USACE Projects |
2017
|
USACE |
Strength Design for Reinforced Concrete Hydraulic Structures (EM 1110-2-2104) |
2016
|
USACE |
A Guide to Public Alerts and Warnings for Dam and Levee Emergencies (EP 1110-2-17) |
2015
|
USACE |
Drilling and Invasive Activities at Dams and Levees (ER 1110-1-1807) |
2014
|
USACE |
Safety and Health Requirements (EM 385-1-1) |
2014
|
USACE |
Dam and Levee Safety: Using Risk-Informed Decision Making |
2012
|
USACE |
Safety of Dams: Policy and Procedures (ER 1110-2-1156) |
2011
|
USACE |
Demonstration of Remotely Operated Vehicles to Aid Underwater Inspection of Corps of Engineers Navigation Structures (ERDC/CRREL TR-08-15) |
2008
|
USACE |
Earthquake Design and Evaluation of Concrete Hydraulic Structures (EM 1110-2-6053) |
2007
|
USACE |
Interim Risk Reduction Measures for Dam Safety (EC 1110-2-6064) |
2007
|
USACE |
Control and Topographic Surveying (EM 1110-1-1005) |
2007
|
USACE |
Stability Analysis of Concrete Structures (EM 1110-2-2100) |
2005
|
USACE |
General Design and Construction Considerations for Earth and Rock-Fill Dams (EM 1110-2-2300) |
2004
|
USACE |
Slope Stability (EM 1110-2-1902) |
2003
|
USACE |
Structural Design and Evaluation of Outlet Works (EM 1110-2-2400) |
2003
|
USACE |
Ice Engineering (EM 1110-2-1612) |
2002
|
USACE |
Contractor’s Guide to Contract Administration |
2002
|
USACE |
Design of Spillway Tainter Gates (EM 1110-2-2702) |
2000
|
USACE |
Roller-Compacted Concrete (EM 1110-2-2006) |
2000
|
USACE |
Response Spectra and Seismic Analysis for Concrete Hydraulic Structures (EM 1110-2-6050) |
1999
|
USACE |
Conduits, Culverts, and Pipes (EM 1110-2-2902) |
1998
|
USACE |
Applications of Roller-Compacted Concrete in Rehabilitation and Replacement of Hydraulic Structures (TR REMR-CS-53) |
1997
|
USACE |
Hydrologic Engineering Requirements for Reservoirs (EM 1110-2-1420) |
1997
|
USACE |
Evaluation and Repair of Concrete Structures (EM 1110-2-2002) |
1995
|
USACE |
Geophysical Exploration for Engineering and Environmental Investigations (EM 1110-1-1802) |
1995
|
USACE |
Gravity Dam Design (EM 1110-2-2200) |
1995
|
USACE |
Chemical Grouting (EM 1110-1-3500) |
1995
|
USACE |
Waterstops and Other Preformed Joint Materials for Civil Works Structures (EM 1110-2-2102) |
1995
|
USACE |
Rock Foundations (EM 1110-1-2908) |
1994
|
USACE |
Seismic Design for Civil Works Buildings (ETL 1110-2-366) |
1994
|
USACE |
Standard Practice for Concrete for Civil Works Structures (EM 1110-2-2000) |
1994
|
USACE |
Test Quarries and Test Fills (EM 1110-2-2301) |
1994
|
USACE |
Arch Dam Design (EM 1110-2-2201) |
1994
|
USACE |
Seepage Analysis and Control for Dams (EM 1110-2-1901) |
1993
|
USACE |
Hydraulic Design of Spillways (EM 1110-2-1603) |
1992
|
USACE |
Settlement Analysis (EM 1110-1-1904) |
1990
|
USACE |
A Guide to Effective Contractor Quality Control (CQC) (EP 715-1-2) |
1990
|
USACE |
Instrumentation for Concrete Structures (EM 1110-2-4300) |
1987
|
USACE |
Sliding Stability for Concrete Structures (ETL 1110-2-256) |
1981
|
USACE |
Hydraulic Design of Reservoir Outlet Works (EM 1110-2-1602) |
1980
|
USACE |
National Program for Inspection of Non-Federal Dams (EM 1110-2-106) |
1980
|
USACE |
Ice Pressure on Engineering Structures (CRREL III-B1b) |
1970
|
USBR |
Design Standards No. 14: Appurtenant Structures for Dams (Ch. 3: General Spillway Design Considerations) |
2022
|
USBR |
Design Standards No. 14: Appurtenant Structures for Dams (Ch. 4: General Outlet Works Design Considerations) |
2022
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 6: Freeboard) |
2021
|
USBR |
USA Dam Removal Experience and Planning (ENV-2021-97) |
2021
|
USBR |
Best Practices in Dam and Levee Safety Risk Analysis |
2019
|
USBR |
Flood Inundation Mapping |
2019
|
USBR |
Design Standards No. 12: Plant Testing (Ch. 1: Synchronous Generator, Motor, and Generator/Motor Field Tests) |
2018
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 20: Geomembranes) |
2018
|
USBR |
Design Standards No. 6: Hydraulic and Mechanical Equipment (Ch. 6: Bulkhead Gates and Stoplogs) |
2018
|
USBR |
Dam Removal Analysis Guidelines for Sediment |
2017
|
USBR |
Design and Construction Considerations for Hydraulic Structures: Roller-Compacted Concrete, 2nd Edition |
2017
|
USBR |
Design Standards No. 6: Hydraulic and Mechanical Equipment (Ch. 18: Engine-Generator Sets) |
2017
|
USBR |
Design Standards No. 6: Hydraulic and Mechanical Equipment (Ch. 12: Trashracks and Trashrack Cleaning Devices) |
2016
|
USBR |
Design Standards No. 6: Hydraulic and Mechanical Equipment (Ch. 14: Auxiliary Mechanical Systems) |
2016
|
USBR |
Design Standards No. 6: Hydraulic and Mechanical Equipment (Ch. 16: Machine Shop Equipment) |
2016
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 13: Seismic Analysis and Design) |
2015
|
USBR |
Design Standards No. 4: Electrical Infrastructure – Plants and Switchyards (Ch. 3: Plant Machine-Voltage Equipment) |
2015
|
USBR |
Guide to Concrete Repair |
2015
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 11: Instrumentation and Monitoring) |
2014
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 15: Foundation Grouting) |
2014
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 16: Cutoff Walls) |
2014
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 19: Geotextiles) |
2014
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 21: Water Removal and Control: Dewatering and Unwatering Systems) |
2014
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 7: Riprap Slope Protection) |
2014
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 8: Seepage) |
2014
|
USBR |
Design Standards No. 3: Water Conveyance Facilities, Fish Facilities, and Roads and Bridges (Ch. 4: Tunnels, Shafts, and Caverns) |
2014
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 17: Soil-Cement Slope Protection) |
2013
|
USBR |
Design Standards No. 14: Appurtenant Structures for Dams (Ch. 2: Hydrologic Considerations) |
2013
|
USBR |
Design Standards No. 6: Hydraulic and Mechanical Equipment (Ch. 11: Heating, Ventilation, and Air-Conditioning Systems) |
2013
|
USBR |
Design Standards No. 1: General Design Standards |
2012
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 10: Embankment Construction) |
2012
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 12: Foundation and Earth Materials Investigation) |
2012
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 2: Embankment Design) |
2012
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 3: Foundation Surface Treatment) |
2012
|
USBR |
Design Standards No. 9: Buildings and Other Structures (Ch. 13: Seismic Design) |
2012
|
USBR |
Design Standards No. 9: Buildings and Other Structures (Ch. 8: Modification of Existing Buildings) |
2012
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards) |
2011
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 4: Static Stability Analysis) |
2011
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 5: Protective Filters) |
2011
|
USBR |
Design Standards No. 13: Embankment Dams (Ch. 9: Static Deformation Analysis) |
2011
|
USBR |
Design Standards No. 14: Appurtenant Structures for Dams (Ch. 1: Introduction) |
2011
|
USBR |
Water Measurement Manual |
2001
|
USBR |
Concrete Manual (Part 2) |
1992
|
USBR |
Cavitation in Chutes and Spillways (EM 42) |
1990
|
USBR |
Criteria and Guidelines for Evacuating Storage Reservoirs and Sizing Low-Level Outlet Works (ACER TM No. 3) |
1990
|
USBR |
Flood Hydrology Manual |
1989
|
USBR |
Downstream Hazard Classification Guidelines (ACER TM 11) |
1988
|
USBR |
Concrete Manual (Part 1) |
1988
|
USBR |
Design of Small Dams |
1987
|
USBR |
Hydraulic Design of Stilling Basins and Energy Dissipators (EM 25) |
1984
|
USBR |
Design Criteria for Concrete Arch and Gravity Dams (EM 19) |
1977
|
USBR |
Design of Arch Dams |
1977
|
USBR |
Design of Gravity Dams |
1976
|
USGS |
Guidelines for Determining Flood Flow Frequency (Bulletin 17C) |
2019
|
USGS |
Frequency Curves |
1989
|
USGS |
Measurement of Peak Discharge at Dams by Indirect Method |
1968
|
USGS |
Discharge Characteristics of Broad-Crested Weirs (GSC-397) |
1967
|