Federal Energy Regulatory Commission, 2015
This chapter of the Engineering Guidelines provides the following:
- The Commission’s requirements for Emergency Action Plan (EAP) submittals and scheduling EAP exercises.
- A basis for preparing and maintaining an effective and workable EAP in a manner consistent with Federal Guidelines.
- Procedures and criteria for performing and reviewing the analytical studies required for an EAP.
- A basis for preparing, performing, and evaluating EAP exercises.
Every EAP should be site-specific with individual project features and potential impacts
governing the content of the plan.