Revision as of 20:45, 16 December 2022 by Grichards (talk | contribs) (Created page with "__NOTOC__ Category:Environmental ---- In evaluating impacts to wetlands and other cultural/environmental features, regulations often require the delineation of permanent impacts and temporary impacts. For example, temporary impacts to wetlands and habitats may result from drawdown of a reservoir below its normal operating level in order to facilitate construction. Conversely, permanent impacts to wetlands and habitats may result from a spillway modification that r...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

In evaluating impacts to wetlands and other cultural/environmental features, regulations often require the delineation of permanent impacts and temporary impacts. For example, temporary impacts to wetlands and habitats may result from drawdown of a reservoir below its normal operating level in order to facilitate construction. Conversely, permanent impacts to wetlands and habitats may result from a spillway modification that raises the normal operating level of a reservoir as a means of increasing storage. Temporary impacts may require some restoration after a construction project is complete, but would generally be expected to recover to their pre-project state. Permanent impacts likely will require other mitigation measures to offset the permanent loss of the resource.


Citations:


Revision ID: 5827
Revision Date: 12/16/2022