User contributions for Cort
9 September 2022
- 13:5113:51, 9 September 2022 diff hist +59 Steel Dams No edit summary
- 13:5013:50, 9 September 2022 diff hist +73 Rubber Dams No edit summary
- 13:4913:49, 9 September 2022 diff hist +45 Timber Dams No edit summary
- 13:4813:48, 9 September 2022 diff hist +54 Composite Dams No edit summary
- 13:4613:46, 9 September 2022 diff hist +126 Concrete/Masonry Dams No edit summary
- 13:2213:22, 9 September 2022 diff hist +41 Low Head Dams No edit summary
8 September 2022
- 20:4320:43, 8 September 2022 diff hist +349 Low Head Dams No edit summary
- 20:3920:39, 8 September 2022 diff hist +217 Tailings Dams No edit summary
- 20:3820:38, 8 September 2022 diff hist +255 Steel Dams No edit summary
- 20:3620:36, 8 September 2022 diff hist +198 Rubber Dams No edit summary
- 20:3520:35, 8 September 2022 diff hist +280 Timber Dams No edit summary
- 20:3120:31, 8 September 2022 diff hist +343 Composite Dams No edit summary
- 20:2620:26, 8 September 2022 diff hist +304 Arch Dams No edit summary
- 20:2220:22, 8 September 2022 diff hist +283 Concrete/Masonry Dams No edit summary
- 20:2220:22, 8 September 2022 diff hist +297 Gravity Dams No edit summary
- 20:2220:22, 8 September 2022 diff hist +251 Buttress Dams No edit summary
- 20:1220:12, 8 September 2022 diff hist 0 N File:Reservoir-lakepowell.jpg No edit summary
- 20:1220:12, 8 September 2022 diff hist 0 N File:Reservoirconstruction-forebay.jpg No edit summary current
- 18:2718:27, 8 September 2022 diff hist 0 N File:Timbercrib-vt.jpg No edit summary current
- 18:2718:27, 8 September 2022 diff hist 0 N File:Tailings-britishcolumbia.jpg No edit summary current
- 18:2718:27, 8 September 2022 diff hist 0 N File:Steel-redridge.jpg No edit summary current
- 18:2618:26, 8 September 2022 diff hist 0 N File:Rubberdam.jpg No edit summary current
- 18:2318:23, 8 September 2022 diff hist 0 N File:Low-head.dockst.jpg No edit summary current
- 18:2318:23, 8 September 2022 diff hist 0 N File:Gravity-conowingo.jpg No edit summary current
- 18:2318:23, 8 September 2022 diff hist 0 N File:Concrete-holtwood.jpg No edit summary current
- 18:2318:23, 8 September 2022 diff hist 0 N File:Composite-folsom.jpg No edit summary current
- 18:1618:16, 8 September 2022 diff hist 0 N File:Buttress.roselend.jpg No edit summary
- 18:1618:16, 8 September 2022 diff hist 0 N File:Arch-gravity.hoover.jpg No edit summary current
- 15:2815:28, 8 September 2022 diff hist −81 O&M of Outlet Works No edit summary
- 15:2515:25, 8 September 2022 diff hist 0 Design and Construction of Outlet Works No edit summary
- 14:5214:52, 8 September 2022 diff hist −1 Low Head Dams No edit summary
- 12:4812:48, 8 September 2022 diff hist +520 Settlement No edit summary
7 September 2022
- 20:4020:40, 7 September 2022 diff hist +1,048 Seismic No edit summary
- 20:2520:25, 7 September 2022 diff hist −1 Design and Construction of Gravity Dams No edit summary
2 September 2022
- 19:0019:00, 2 September 2022 diff hist +835 Controlling Animal Activity No edit summary
- 18:5918:59, 2 September 2022 diff hist +1,019 Vegetation Management No edit summary
- 18:5218:52, 2 September 2022 diff hist +4,149 N Inflow Design Flood Created page with "__NOTOC__ ---- According to the Association of State Dam Safety Officials (ASDSO), the most common dam failure incident mechanism between 2010 and 2019 was dam overtopping.<ref name="ASDSO">ASDSO, 2022, https://damsafety.org/dam-failures</ref> The dam spillway, and its Inflow Design Flood (IDF), must have sufficient capacity and freeboard to prevent overtopping from occurring. “Selection of an IDF can involve tradeoffs in trying to satisfy multiple objectives includ..."
- 18:5218:52, 2 September 2022 diff hist +2,379 N Borrow Investigation Created page with "__NOTOC__ ---- Earthen embankment dams are most cost effective if the material is extracted from the proposed reservoir location. Not only are transportation costs of the material minimized, but the material volume can then be added to the total eventual water storage of the reservoir once filled. Additionally, sourcing the borrow material from within the proposed reservoir reduces the impact of excavation and extraction of native soils from locations that will not be in..."
- 17:2017:20, 2 September 2022 diff hist +5,760 Seepage Analysis & Filter/Drain Design No edit summary
- 17:1617:16, 2 September 2022 diff hist +15 Design and Construction of Embankment Dams No edit summary
- 17:0917:09, 2 September 2022 diff hist −88 Foundation Evaluation No edit summary