Ice Engineering (EM 1110-2-1612): Difference between revisions
From ASDSO Dam Safety Toolbox
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
|author= | |author= | ||
<!-- Add document | <!-- Add document author/publisher below--> | ||
U.S. Army Corps of Engineers | U.S. Army Corps of Engineers | ||
Revision as of 15:37, 3 June 2022
U.S. Army Corps of Engineers, 2002
This manual, composed of three parts, presents in Part I the current guidance for the planning, design, construction, and operation and maintenance of ice control and ice suppression measures for Corps of Engineers projects; provides in Part II the current guidance for dealing with ice jams and the resultant flooding, including preventive measures; and gives in Part III the current guidance for engineering and operational solutions to ice problems on rivers used for navigation.
Revision ID: 717
Revision Date: 06/03/2022