Ice Engineering (EM 1110-2-1612): Difference between revisions
From ASDSO Dam Safety Toolbox
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
|author= | |author= | ||
<!-- Add document title below--> | <!-- Add document title below--> | ||
U.S. Army Corps of | U.S. Army Corps of Engineers | ||
|date= | |date= |
Revision as of 05:45, 3 June 2022
U.S. Army Corps of Engineers, 2002
This manual, composed of three parts, presents in Part I the current guidance for the planning, design, construction, and operation and maintenance of ice control and ice suppression measures for Corps of Engineers projects; provides in Part II the current guidance for dealing with ice jams and the resultant flooding, including preventive measures; and gives in Part III the current guidance for engineering and operational solutions to ice problems on rivers used for navigation.
Revision ID: 699
Revision Date: 06/03/2022