ASDSO Dam Safety Toolbox

Ice Engineering (EM 1110-2-1612): Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
No edit summary
No edit summary
Line 3: Line 3:
|author=  
|author=  
<!-- Add document title below-->
<!-- Add document title below-->
U.S. Army Corps of Engineering
U.S. Army Corps of Engineers


|date=
|date=

Revision as of 05:45, 3 June 2022

U.S. Army Corps of Engineers, 2002



This manual, composed of three parts, presents in Part I the current guidance for the planning, design, construction, and operation and maintenance of ice control and ice suppression measures for Corps of Engineers projects; provides in Part II the current guidance for dealing with ice jams and the resultant flooding, including preventive measures; and gives in Part III the current guidance for engineering and operational solutions to ice problems on rivers used for navigation.


Document Download:

2002 (current)
1999


Errata/Special Notes:

Open Here



Revision ID: 699
Revision Date: 06/03/2022