ASDSO Dam Safety Toolbox

Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 2- Selecting and Accommodating Inflow Design Floods for Dams: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
No edit summary
No edit summary
 
Line 15: Line 15:
|link=  
|link=  
<!-- Add Url to document below (To retrieve URL from a pdf, add document as a pdf file and copy link address from its page-->
<!-- Add Url to document below (To retrieve URL from a pdf, add document as a pdf file and copy link address from its page-->
https://damsafetytoolbox.org/images/3/34/CH2.pdf
https://damtoolbox.org/images/3/34/CH2.pdf


|abstract=  
|abstract=  

Latest revision as of 23:04, 16 December 2022

Federal Energy Regulatory Commission, 2015



The purpose of this chapter of the Guidelines is to provide technical guidance for determining the appropriate Inflow Design Flood (IDF) to be used in the review of spillway and appurtenant structure designs and to conform to the provisions of the Federal Guidelines for Dam Safety.

This chapter is not intended to provide a complete manual of all procedures used for estimating inflow design floods for spillways, because the selection of procedures is dependent upon available hydrologic data and individual watershed characteristics. All studies submitted to the Commission should be performed by a competent engineer experienced in hydrology and hydraulics, and should contain a summary of the design assumptions, design analyses, and methodologies used to evaluate the inflow design flood.


Document Download:

2015 (current)


Errata/Special Notes:

None



Revision ID: 5859
Revision Date: 12/16/2022