Design Standards No. 4: Electrical Infrastructure – Plants and Switchyards (Ch. 3: Plant Machine-Voltage Equipment): Difference between revisions
(Created page with "{{References Template <!-- Add author/publisher below--> |author= The United States Bureau of Reclamation <!-- Add publication year --> |date= 2015 <!--create a file below in format File:example.png, then add picture to that file--> |picture= File:DS4-3.jpg <!-- Add URL to document below (To retrieve URL from a PDF, add document as a PDF file and copy link address from its page--> |link= https://3.238.206.13/images/7/7c/DS4-3.pdf <!-- Add document summary--> |abstra...") |
Rmanwaring (talk | contribs) No edit summary |
||
Line 15: | Line 15: | ||
<!-- Add URL to document below (To retrieve URL from a PDF, add document as a PDF file and copy link address from its page--> | <!-- Add URL to document below (To retrieve URL from a PDF, add document as a PDF file and copy link address from its page--> | ||
|link= | |link= | ||
https:// | https://damsafetytoolbox.org/images/7/7c/DS4-3.pdf | ||
<!-- Add document summary--> | <!-- Add document summary--> |
Revision as of 20:18, 13 December 2022
The United States Bureau of Reclamation, 2015
The Bureau of Reclamation design standards present technical requirements and processes to enable design professionals to prepare design documents and reports necessary to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. Compliance with these design standards assists in the development and improvement of Reclamation facilities in a way that protects the public's health, safety, and welfare; recognizes needs of all stakeholders; and achieves lasting value and functionality necessary for Reclamation facilities. Responsible designers accomplish this goal through compliance with these design standards and all other applicable technical codes, as well as incorporation of the stakeholders’ vision and values, that are then reflected in the constructed facilities. The purpose of this chapter is to briefly explain important concepts pertaining to the electrical infrastructure design of power system equipment for Bureau of Reclamation (Reclamation) hydroelectric powerplants and pumping (electrically operated) and pump-generating plants.
Revision ID: 5373
Revision Date: 12/13/2022