ASDSO Dam Safety Toolbox

Construction: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
No edit summary
No edit summary
Line 8: Line 8:
|link=
|link=
<!-- Add picture caption -->
<!-- Add picture caption -->
|caption=
|caption=Construction of an embankment dam.
}}
}}


<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed -->
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed -->
"Some of the potential problems that could occur during construction can be reduced by clear, concise specifications and clear, concise instructions to contract administration personnel regarding design assumptions and reasons for design requirements.  This information is usually conveyed in the construction considerations document that is prepared by the design staff for the construction staff.  Because most of this information is also valuable to the contractor, the current policy is to include construction considerations and the basis for various assumptions in applicable sections of the specifications.  For example, geologic and [[engineering]] reasons for specifying excavation to particular surfaces for the foundation of the dam should be included in the specification section on foundation excavation.  Confidence in the information on which the requirements are based should also be conveyed in the specifications.  When this type of information is provided in the applicable technical paragraphs of the specifications, it gives prospective bidders a clearer, more informed basis for preparing their bid and, therefore, a better opportunity for a more responsive bid, which results in less likelihood that claim situations will develop.  It also minimizes the possibility that the contractor will deny lack of knowledge of information that was essential to preparation of the bid."<ref name="DS13-10">[[Design Standards No. 13: Embankment Dams (Ch. 10: Embankment Construction) | Design Standards No. 13: Embankment Dams (Ch. 10: Embankment Construction), USBR, 2012]]</ref>
"Some of the potential problems that could occur during construction can be reduced by clear, concise specifications and clear, concise instructions to contract administration personnel regarding design assumptions and reasons for design requirements.  This information is usually conveyed in the [[Construction Considerations|construction considerations]] document that is prepared by the design staff for the construction staff.  Because most of this information is also valuable to the contractor, the current policy is to include construction considerations and the basis for various assumptions in applicable sections of the specifications.  For example, geologic and [[engineering]] reasons for specifying excavation to particular surfaces for the foundation of the dam should be included in the specification section on foundation excavation.  Confidence in the information on which the requirements are based should also be conveyed in the specifications.  When this type of information is provided in the applicable technical paragraphs of the specifications, it gives prospective bidders a clearer, more informed basis for preparing their bid and, therefore, a better opportunity for a more responsive bid, which results in less likelihood that claim situations will develop.  It also minimizes the possibility that the contractor will deny lack of knowledge of information that was essential to preparation of the bid."<ref name="DS13-10">[[Design Standards No. 13: Embankment Dams (Ch. 10: Embankment Construction) | Design Standards No. 13: Embankment Dams (Ch. 10: Embankment Construction), USBR, 2012]]</ref>


==Roles and Responsibilities==
==Roles and Responsibilities==

Revision as of 17:48, 6 December 2022


Construction of an embankment dam.

"Some of the potential problems that could occur during construction can be reduced by clear, concise specifications and clear, concise instructions to contract administration personnel regarding design assumptions and reasons for design requirements. This information is usually conveyed in the construction considerations document that is prepared by the design staff for the construction staff. Because most of this information is also valuable to the contractor, the current policy is to include construction considerations and the basis for various assumptions in applicable sections of the specifications. For example, geologic and engineering reasons for specifying excavation to particular surfaces for the foundation of the dam should be included in the specification section on foundation excavation. Confidence in the information on which the requirements are based should also be conveyed in the specifications. When this type of information is provided in the applicable technical paragraphs of the specifications, it gives prospective bidders a clearer, more informed basis for preparing their bid and, therefore, a better opportunity for a more responsive bid, which results in less likelihood that claim situations will develop. It also minimizes the possibility that the contractor will deny lack of knowledge of information that was essential to preparation of the bid."[1]

Roles and Responsibilities

Types of Construction Activities

Construction Management Services