Design Standards No. 12: Plant Testing (Ch. 1: Synchronous Generator, Motor, and Generator/Motor Field Tests): Difference between revisions
Rmanwaring (talk | contribs) No edit summary |
No edit summary |
||
Line 15: | Line 15: | ||
<!-- Add URL to document below (To retrieve URL from a PDF, add document as a PDF file and copy link address from its page--> | <!-- Add URL to document below (To retrieve URL from a PDF, add document as a PDF file and copy link address from its page--> | ||
|link= | |link= | ||
https:// | https://damtoolbox.org/images/f/f9/DS12-1.pdf | ||
<!-- Add document summary--> | <!-- Add document summary--> |
Latest revision as of 00:00, 17 December 2022
The United States Bureau of Reclamation, 2018
The Bureau of Reclamation design standards present technical requirements and processes to enable design professionals to prepare design documents and reports necessary to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. Compliance with these design standards assists in the development and improvement of Reclamation facilities in a way that protects the public's health, safety, and welfare; recognizes needs of all stakeholders; and achieves lasting value and functionality necessary for Reclamation facilities. Responsible designers accomplish this goal through compliance with these design standards and all other applicable technical codes, as well as incorporation of the stakeholders’ vision and values, that are then reflected in the constructed facilities. This chapter specifies recommended tests for large synchronous generators, motors, and generator/motor installations for new machines or existing machines that have been modified or uprated.