ASDSO Dam Safety Toolbox

Care and Diversion of Water: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
No edit summary
Tag: Manual revert
No edit summary
Line 5: Line 5:
{{Picture
{{Picture
<!-- Add image file name (ex.image.jpg) -->
<!-- Add image file name (ex.image.jpg) -->
|image=Sheetpile-dewatering.jpg
|image=WaterDiversionTunnel.jpg
<!--Add link if applicable -->
<!--Add link if applicable -->
|link=
|link=
<!-- Add picture caption -->
<!-- Add picture caption -->
|caption=Construction of a sheet pile wall in preparation for dewatering.
|caption=Construction of a tunnel for the diversion of water at a construction site.
}}
}}


Line 18: Line 18:


==Best Practices Resources==
==Best Practices Resources==
{{Document Icon}} [[Management of Water Control Systems (EM 1110-2-3600) | Management of Water Control Systems (EM 1110-2-3600), USACE, 2017]]
{{Document Icon}} [[Design Standards No. 13: Embankment Dams (Ch. 21: Water Removal and Control: Dewatering and Unwatering Systems) | Design Standards No. 13: Embankment Dams (Ch. 21: Water Removal and Control: Dewatering and Unwatering Systems), USBR, 2014]]
{{Document Icon}} [[Design Standards No. 14: Appurtenant Structures for Dams (Ch. 2: Hydrologic Considerations) | Design Standards No. 14: Appurtenant Structures for Dams (Ch. 2: Hydrologic Considerations) (Bureau of Reclamation), USBR, 2013]]
{{Document Icon}} [[Design Standards No. 14: Appurtenant Structures for Dams (Ch. 2: Hydrologic Considerations) | Design Standards No. 14: Appurtenant Structures for Dams (Ch. 2: Hydrologic Considerations) (Bureau of Reclamation), USBR, 2013]]
{{Document Icon}} [[Design of Small Dams | Design of Small Dams, USBR, 1987]]
{{Document Icon}} [[Design of Small Dams | Design of Small Dams, USBR, 1987]]

Revision as of 17:17, 6 December 2022


Construction of a tunnel for the diversion of water at a construction site.

"Construction of many conventional water projects such as dams, dikes, canals, siphons, and pumping plants requires some degree of excavation, which often extends below the local water table. The excavation can be an expensive operation, depending on the required depth, subsurface materials, and groundwater conditions. Water Removal and Control (WR&C) systems are often employed along with other techniques such as unwatering methods and/or cutoff walls in controlling the water and seepage within and surrounding the excavations. WR&C systems can be constructed by a variety of methods, either singly or in combinations, to effectively remove and control groundwater to facilitate excavation and construction activities 'in the dry' and to maintain stability of excavated slopes. Effective WR&C systems are also important to construction scheduling and safety of the construction crews, downstream populations and infrastructures, and the safety of the embankment dam itself."[1]

"Design of WR&C systems should rely as much on experience as on the theory and calculations. Each site is unique, and no two systems will be exactly alike. Additionally, there is no one correct design, although some designs may be more applicable than others to specific site conditions. A well-suited design may include multiple features employing different technologies and configurations to achieve the desired goals."[1]

Best Practices Resources

Design Standards No. 14: Appurtenant Structures for Dams (Ch. 2: Hydrologic Considerations) (Bureau of Reclamation), USBR, 2013

Design of Small Dams, USBR, 1987

Trainings

On-Demand Webinar: Stream Management for Dam Construction

On-Demand Webinar: Managing Increased Dam Safety Risk During Reconstruction