ASDSO Dam Safety Toolbox

Rubber Dams: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
No edit summary
No edit summary
Line 1: Line 1:
__NOTOC__
__NOTOC__
[[Category:Types]]
----
----
{{Picture
{{Picture
Line 13: Line 14:
}}
}}


Rubber dams are inflatable, cylindrical dams placed across channels that act as a weir or dam to raise the upstream water level when the structure is inflated. They are typically made of a rubberized fabric membrane. Stainless steel mesh or ceramic chips can be embedded in the membrane to hinder vandalism. They can be filled with water, air, or both. Rubber dams are normally used to temporarily increase storage at existing dams, divert water for irrigation, provide flood control, or provide a reservoir for recreation.  
Rubber dams are inflatable, cylindrical dams placed across channels that act as a weir or dam to raise the upstream water level when the structure is inflated. They are typically made of a rubberized fabric membrane. Stainless steel mesh or ceramic chips can be embedded in the membrane to hinder vandalism. They can be filled with water, air, or both. Rubber dams are normally used to temporarily increase storage at existing dams, divert water for [[irrigation]], provide flood control, or provide a reservoir for [[recreation]].  


==Best Practices Resources==
==Best Practices Resources==

Revision as of 00:01, 17 November 2022


An example of an inflatable rubber dam. (Wikipedia)

Rubber dams are inflatable, cylindrical dams placed across channels that act as a weir or dam to raise the upstream water level when the structure is inflated. They are typically made of a rubberized fabric membrane. Stainless steel mesh or ceramic chips can be embedded in the membrane to hinder vandalism. They can be filled with water, air, or both. Rubber dams are normally used to temporarily increase storage at existing dams, divert water for irrigation, provide flood control, or provide a reservoir for recreation.

Best Practices Resources

Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 10- Other Dams (Federal Energy Regulatory Commission)


Revision ID: 4200
Revision Date: 11/17/2022