ASDSO Dam Safety Toolbox

Risk Management for Dam Safety: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
(Created page with "__NOTOC__ ---- <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> Page Summary ==Other Headings== Info ==Examples== {{Website Icon}} ==Best Practices Resources== {{Document Icon}} ==Trainings== {{Video Icon}} <!-- For information on notation for in text citations visit https://www.mediawiki.org/wiki/Help:Cite Or simply enclose the citation as shown <ref> citation </ref> in the location of the in text mention. Citations...")
 
No edit summary
Line 2: Line 2:
----
----
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed -->
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed -->
Page Summary
“The term ‘risk,’ when used in the context of dam safety, is comprised of three parts: (1) the likelihood of occurrence of a load (e.g., flood earthquake, etc.), (2) the likelihood of an adverse structural response (e.g., dam failure, damaging spillway discharge, etc.), and (3) the magnitude of the consequences resulting from that adverse event (e.g., life loss, economic damages, environmental damages, etc.)” (FEMA, Federal Guidelines for Dam Safety Risk Management, 2015).


==Other Headings==
According to the United States Army Corps of Engineers (USACE), risk is defined as “the measure of the probability and severity of undesirable consequences” (USACE FAQ Definitions, DATE). Risk is further defined by the USACE as the product of the frequency of an event, the probability of occurrence of that event, and the consequences of that event (USACE FAQ Definitions, DATE). In recent years, risk has become a major factor in identifying where resources should be expended to achieve the highest increase in public safety. The process of using risk in this manner is known as Risk-Informed Decision Making (RIDM) and includes an entire process of identifying and analyzing potential failure modes to reduce the overall risk of a dam failure.
Info
 
[[Risk Analysis]]</br>
[[Risk Assessment]]</br>
[[Risk Management]]</br>
[[Risk Communication]]</br>


==Examples==
==Examples==

Revision as of 15:39, 8 September 2022


“The term ‘risk,’ when used in the context of dam safety, is comprised of three parts: (1) the likelihood of occurrence of a load (e.g., flood earthquake, etc.), (2) the likelihood of an adverse structural response (e.g., dam failure, damaging spillway discharge, etc.), and (3) the magnitude of the consequences resulting from that adverse event (e.g., life loss, economic damages, environmental damages, etc.)” (FEMA, Federal Guidelines for Dam Safety Risk Management, 2015).

According to the United States Army Corps of Engineers (USACE), risk is defined as “the measure of the probability and severity of undesirable consequences” (USACE FAQ Definitions, DATE). Risk is further defined by the USACE as the product of the frequency of an event, the probability of occurrence of that event, and the consequences of that event (USACE FAQ Definitions, DATE). In recent years, risk has become a major factor in identifying where resources should be expended to achieve the highest increase in public safety. The process of using risk in this manner is known as Risk-Informed Decision Making (RIDM) and includes an entire process of identifying and analyzing potential failure modes to reduce the overall risk of a dam failure.

Risk Analysis
Risk Assessment
Risk Management
Risk Communication

Examples

Best Practices Resources

Trainings


Citations: