(Created page with "<!--Example Page --> <div style= "text-align:center;"> <!-- Add message here --> ''Message: Concrete bedding installs relatively quickly, without the need for compaction under pipe haunces'' </div> ----</br> <!-- Add body paragraphs here --> Concrete bedding was used successfully in this Montana dam. Placing and encasing the 170-ft, 48-inch concrete outlet conduit was estimated to cost $133,000 (2013 cost). Six days of work effort were required to construct the foundatio...") |
No edit summary |
||
Line 23: | Line 23: | ||
</gallery> | </gallery> | ||
[[Category:Example Pages]] | [[Category:Example Pages]] | ||
{{Revhistinf}} | {{Revhistinf}} |
Revision as of 19:55, 27 June 2022
Message: Concrete bedding installs relatively quickly, without the need for compaction under pipe haunces
Concrete bedding was used successfully in this Montana dam. Placing and encasing the 170-ft, 48-inch concrete outlet conduit was estimated to cost $133,000 (2013 cost). Six days of work effort were required to construct the foundation of the spillway riser, excavate the outlet conduit trench, and place the outlet conduit (including concrete bedding placement).
Revision ID: 1674