ASDSO Dam Safety Toolbox

Contractor: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
No edit summary
No edit summary
 
(5 intermediate revisions by 2 users not shown)
Line 6: Line 6:
{{Picture  
{{Picture  
<!-- Add image file name (ex.image.jpg) -->  
<!-- Add image file name (ex.image.jpg) -->  
|image= const1.jpg
|image= Sun_Road_construction.jpg
<!--Add link if applicable -->  
<!--Add link if applicable -->  
|link=  
|link=  
<!-- Add picture caption -->  
<!-- Add picture caption -->  
|caption= Construction of an earthen embankment dam.
|caption= Construction crew paving around milepost 33 on Sun Road.
(Image Source: U.S. Dept. of Transportation)
}}  
}}  


<!-- Introductory paragraph or topic page summary -->  
<!-- Introductory paragraph or topic page summary -->  
"The responsibility for administering [[construction]] and supply contracts, for understanding the design and contract intent, for maintaining technical coordination between design and construction engineers, and for managing the construction staff to assure compliance with specifications should be vested in an identified engineer at the construction project. He should have the administrative and technical control of all resources necessary to accomplish safe construction of the dam. Construction personnel should understand the conditions upon which the design is based and the relationship between these conditions and the design features. When unanticipated conditions are encountered, design personnel should be involved in determining
A contractor is responsible for providing all of the material, labor, equipment and services necessary for the construction of a project. Contractors often hire specialized subcontractors to perform all or portions of the construction work. When using subcontractors, the general contractor is responsible for overseeing the quality of all work performed by any and all of the workers and subcontractors.
their effect."<ref name="FGDS-2004">[[Federal Guidelines for Dam Safety | Federal Guidelines for Dam Safety, FEMA, 2004]]</ref>


==[[Best Practices Resources]]==
"Construction contracts should be based on site conditions as interpreted at the time of contract award. All anticipated work on foundation cleanup, preparation, and treatment should be included as specified items of the work. Contract provisions should require the contractor to submit to the construction engineer advance notice of significant shift change, to enable adequate inspection coverage of multishift operations. "<ref name="FGDS-2004">[[Federal Guidelines for Dam Safety (FEMA P-93) | Federal Guidelines for Dam Safety (FEMA P-93), FEMA, 2004]]</ref>
{{Document Icon}} [[Federal Guidelines for Dam Safety | Federal Guidelines for Dam Safety, FEMA, 2004]]


==[[Trainings]]==  
"The responsibility for administering [[construction]] and supply contracts, for understanding the design and contract intent, for maintaining technical coordination between design and construction engineers, and for managing the construction staff to assure compliance with [[specifications]] should be vested in an identified engineer at the construction project. He should have the administrative and technical control of all resources necessary to accomplish safe construction of the dam. Construction personnel should understand the conditions upon which the design is based and the relationship between these conditions and the design features. When unanticipated conditions are encountered, design personnel should be involved in determining their effect.<ref name="FGDS-2004"/>
 
==Best Practices Resources==
{{Document Icon}} [[Federal Guidelines for Dam Safety (FEMA P-93) | Federal Guidelines for Dam Safety (FEMA P-93), FEMA]]
 
==Trainings==  
{{Video Icon}} [[On-Demand Webinar: Dam Construction Quality Control: Dos, Dont's and Lessons Learned]]
{{Video Icon}} [[On-Demand Webinar: Dam Construction Quality Control: Dos, Dont's and Lessons Learned]]
{{Video Icon}} [[On-Demand Webinar: Quality Assurance and Field Inspection for Dam Construction Projects]]
{{Video Icon}} [[On-Demand Webinar: Quality Assurance and Field Inspection for Dam Construction Projects]]

Latest revision as of 15:31, 21 July 2023


Construction crew paving around milepost 33 on Sun Road.

(Image Source: U.S. Dept. of Transportation)

A contractor is responsible for providing all of the material, labor, equipment and services necessary for the construction of a project. Contractors often hire specialized subcontractors to perform all or portions of the construction work. When using subcontractors, the general contractor is responsible for overseeing the quality of all work performed by any and all of the workers and subcontractors.

"Construction contracts should be based on site conditions as interpreted at the time of contract award. All anticipated work on foundation cleanup, preparation, and treatment should be included as specified items of the work. Contract provisions should require the contractor to submit to the construction engineer advance notice of significant shift change, to enable adequate inspection coverage of multishift operations. "[1]

"The responsibility for administering construction and supply contracts, for understanding the design and contract intent, for maintaining technical coordination between design and construction engineers, and for managing the construction staff to assure compliance with specifications should be vested in an identified engineer at the construction project. He should have the administrative and technical control of all resources necessary to accomplish safe construction of the dam. Construction personnel should understand the conditions upon which the design is based and the relationship between these conditions and the design features. When unanticipated conditions are encountered, design personnel should be involved in determining their effect.[1]

Best Practices Resources

Federal Guidelines for Dam Safety (FEMA P-93), FEMA

Trainings

On-Demand Webinar: Dam Construction Quality Control: Dos, Dont's and Lessons Learned

On-Demand Webinar: Quality Assurance and Field Inspection for Dam Construction Projects

On-Demand Webinar: Pitfalls in Quality Control Processes for Compacted Earth Fill

On-Demand Webinar: Best Management Practices for Waterstop Selection, Installation, and Inspection


Citations:


Revision ID: 7384
Revision Date: 07/21/2023