Underwater Construction: Difference between revisions
From ASDSO Dam Safety Toolbox
(Created page with "<!--Example Page --> <div style= "text-align:center;"> <!-- Add message here --> ''Message: Divers may be required to complete construction.'' </div> ----</br> <!-- Add body paragraphs here --> At times, rehabilitating existing structures can present very difficult access and construction environments. Performing construction on underwater structures within a reservoir or outlet may be required. The Willow Creek dam is an earthen dam constructed in 1966 that impounds a...") |
No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
[[Category:Construction Considerations Outlet Works]] | |||
---- | |||
''' ''Message: Divers may be required to complete [[construction]].'' ''' | |||
''Message: Divers may be required to complete construction.'' | |||
<!-- Add body paragraphs here --> | <!-- Add body paragraphs here --> | ||
At times, rehabilitating existing structures can present very difficult access and construction environments. Performing construction on underwater structures within a reservoir or outlet may be required. | At times, rehabilitating existing structures can present very difficult access and construction environments. Performing construction on underwater structures within a reservoir or outlet may be required. | ||
The Willow Creek dam is an earthen dam constructed in 1966 that impounds a tributary of the Colorado River. A project was completed to rehabilitate the existing outlet works that included the following tasks: | The Willow Creek dam is an earthen dam constructed in 1966 that impounds a tributary of the [[Colorado]] River. A project was completed to rehabilitate the existing outlet works that included the following tasks: | ||
*Install 20' pipe segment with blind flange. | *Install 20' pipe segment with blind flange. | ||
Line 29: | Line 27: | ||
</gallery> | </gallery> | ||
''Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.'' | |||
[[Category:Example Pages]] | [[Category:Example Pages]] | ||
{{Revhistinf}} | {{Revhistinf}} |
Latest revision as of 03:33, 2 December 2022
Message: Divers may be required to complete construction.
At times, rehabilitating existing structures can present very difficult access and construction environments. Performing construction on underwater structures within a reservoir or outlet may be required.
The Willow Creek dam is an earthen dam constructed in 1966 that impounds a tributary of the Colorado River. A project was completed to rehabilitate the existing outlet works that included the following tasks:
- Install 20' pipe segment with blind flange.
- Reline existing outlet works with steel pipe and replace 2 existing valves in the dry.
- Add new hydraulically operated gate valve.
- Install trash rack and run hydraulic lines.