ASDSO Dam Safety Toolbox

Test Quarries and Test Fills: Revision history

Jump to: navigation, search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

28 July 2023

1 June 2023

31 May 2023

30 May 2023

  • curprev 22:5822:58, 30 May 2023Jeremy.franz@state.co.us talk contribs 2,513 bytes +31 No edit summary
  • curprev 22:5322:53, 30 May 2023Jeremy.franz@state.co.us talk contribs 2,482 bytes +2,482 Created page with ""An integral part of the development of large civil works projects is the establishment of sources of material for embankment or fill construction. Many water-retention and water-conveyance projects require large volumes of rock material. As a consequence, the selection of the project site and the selection of the types of project components frequently involve the type and availability of soil and rock materials. Test quarries are especially important where there are que..."