ASDSO Dam Safety Toolbox

Serviceability: Revision history

Jump to: navigation, search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 December 2022

14 December 2022

  • curprev 19:1319:13, 14 December 2022Grichards talk contribs 1,177 bytes +1,177 Created page with "<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> __NOTOC__ Category:Structural Design Considerations ---- <!-- Introductory paragraph or topic page summary --> "Most dams have expected service lives of 100 years or more. This lengthy life span and the frequently harsh service environment pose long term maintenance, repair and upgrade problems. To the extent practicable, the design should anticipate these problems and..."