  • curprev 19:4319:43, 27 June 2022Camrenbt talk contribs 1,166 bytes +1,166 Created page with "Good construction practices are critical in the proper installation of pipes. If good construction practices are not implemented, it may introduce deficiencies that can increase the potential of dam failure. Two components that are important to consider during construction are the bedding configuration and the pipe grade. ==Bedding== For a concrete encased bedding configuration, the embankment is first excavated to create a large trench through the dam. Fill is then pla..."