ASDSO Dam Safety Toolbox

Fuseplug Spillways: Revision history

Jump to: navigation, search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

25 July 2023

14 December 2022

2 December 2022

  • curprev 22:2522:25, 2 December 2022Grichards talk contribs 2,455 bytes +2,455 Created page with "__NOTOC__ Category:Controlled Spillways ---- “These types of control structures are associated with staged releases and suited for auxiliary and emergency spillways. A fuseplug control structure may include one or multiple bays containing the fuseplug embankments. The zoned embankments will be placed to a specified height and include a pilot channel through each embankment crest set to a specified elevation associated with a given flood eve..."