ASDSO Dam Safety Toolbox

Borrow Investigation: Revision history

Jump to: navigation, search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

18 July 2023

11 July 2023

16 March 2023

20 December 2022

14 December 2022

18 November 2022

21 October 2022

17 September 2022

16 September 2022

13 September 2022

9 September 2022

6 September 2022

2 September 2022

  • curprev 18:5218:52, 2 September 2022Cort talk contribs 2,379 bytes +2,379 Created page with "__NOTOC__ ---- Earthen embankment dams are most cost effective if the material is extracted from the proposed reservoir location. Not only are transportation costs of the material minimized, but the material volume can then be added to the total eventual water storage of the reservoir once filled. Additionally, sourcing the borrow material from within the proposed reservoir reduces the impact of excavation and extraction of native soils from locations that will not be in..."