ASDSO Dam Safety Toolbox

Auxiliary Spillways: Revision history

Jump to: navigation, search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 July 2023

14 December 2022

2 December 2022

18 November 2022

21 October 2022

27 September 2022

16 September 2022

7 September 2022

  • curprev 23:0423:04, 7 September 2022Rmanwaring talk contribs 1,526 bytes +1,526 Created page with "__NOTOC__ ---- <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> “An auxiliary spillway is infrequently used and may be a secondary spillway (augmenting a service spillway discharge capacity). During operation there could be some degree of structural damage or erosion to the auxiliary spillway due to releases up to and including the maximum design discharge. Auxiliary spillways may be less robust, erosion-resistant str..."